- planned couples: loose wagons join the train at a route stop, added
from the schedule yards tab; capacity credits them per corridor edge
and coupling validates locomotive weight/length caps per leg
- real-cut toggle: a cut wagon permanently leaves the train build at
its cut yard (soft cut still sits out one trip only)
- fix heaviest-leg display counting a shared slot's full cargo on
every spanned edge (phantom pull-weight overload on S-2026-00045)
- confirmation dialogs for workspace add/load/unload/remove actions
- train-builder History and Detached-wagons tabs, backed by paginated
endpoints; builder detaches now always write adjustment-log rows
Migrations 3660 (planned_wagon_couples, planned_wagon_real_cuts) and
3670 (adjustment log train_schedule_id nullable) — both applied to the
dev DB by hand; watch mode does not run migrations.
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
- Added functionality to cancel contracts, allowing users to provide a reason for cancellation.
- Updated contract statuses to include SUSPENDED and changed CLOSED to COMPLETED.
- Enhanced the UI to reflect the new cancellation option and updated messaging for contract statuses.
- Refactored contract booking actions to accommodate changes in booking logic for ONE_TIME and GENERAL contracts.
- Removed clearance document management from the contract detail page, as it is now handled per booking.
- Introduced a SQL script to reset bookings and train schedules for development purposes.