Commit Graph

172 Commits

Author SHA1 Message Date
Marshal
ef840241c0 permision 2026-07-22 12:34:08 +00:00
Nathnael
905bf75bce fix: test 2026-07-22 07:47:25 +00:00
Marshal
ed3c8307bb refactor(train-scheduling): rename and restructure container movement logic 2026-07-21 23:49:10 +00:00
Marshal
835c9e111c feat(train-scheduling): implement container movement between wagons
- Added functionality to move containers between wagons in the train scheduling system.
- Introduced  API endpoint and service method to handle container movement.
- Updated  component to support drag-and-drop for rearranging containers.
- Enhanced  to allow moving containers to other wagons via a context menu.
- Implemented UI feedback for container movement actions, including loading states and success/error notifications.
- Updated relevant types and constants to accommodate new container movement logic.
- Added tests for the rule engine to ensure proper handling of hazardous bookings.
2026-07-21 23:02:06 +00:00
Hagernesh
1fe8c2fd8e feat(export): gate receive on payment and loading on received + GRN
Three export rules that the flow left open.

An unpaid export booking could be received at the warehouse. Receiving is
what starts storage and mints a GRN, so it must not happen against cargo the
customer has not settled. receive() now rejects an unpaid EXPORT booking.
Import is untouched — it arrives OFF a train and its receive is the unload,
so gating that on payment would strand cargo already at the yard.

An allocated export booking could be marked loaded onto its train without
ever reaching the warehouse. An allocation is a plan; the GRN is the proof
the goods are in hand. Two loading paths skipped that check — the per-yard
loadBooking and the workspace confirmScheduleLoading — and both now require
every export booking to be received with a GRN first, however it arrived
(first-mile or the customer's own truck) and whatever it is allocated to.
The rule lives in one shared guard (assertExportReceivedWithGrn) so the two
paths cannot drift.

Export self-haul without a first-mile leg already worked and is unchanged:
assertSelfHaulPaid allows a customer truck when there is no EDR mile leg and
the booking is paid, and addTruck applies the same one-40ft-or-two-20ft rule
to containers and the tonnage drawdown to bulk, exactly as import does.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-21 08:01:32 +00:00
marshal
bb068d38d1 Merge pull request #834 from Tria-plc/freight_feature/usermanagement
Freight feature/usermanagement
2026-07-20 13:52:55 +03:00
Marshal
eb532399d9 changes 2026-07-20 10:52:20 +00:00
Hagernesh
2906c6bb45 test(train-scheduling): cover the checkpoint backdating guard on the DTO
The IsNotBackdated validator was covered in isolation, but not on the DTO
that actually carries it. Asserts a backdated occurredAt is rejected, that
"now" passes, and that omitting the field still validates so the service can
stamp it.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-20 07:13:52 +00:00
Hagernesh
21df861979 back date validator 2026-07-20 07:13:52 +00:00
Hagernesh
c0fdffa7ef Marshalling document empty wagon rendering 2026-07-20 07:13:52 +00:00
Hagernesh
a5973de6e1 feat(intercity): a facility only handles the cargo its equipment can lift
Containers need a reach stacker or gantry, so only Indode, Modjo and Dire Dawa
take them. Bulk needs far less and is handled at all five facilities. Having a
facility was previously enough to load anything, so a container booking through
Sebeta or Adama would have been accepted and then had nothing to lift it.

- yard_facilities gains handles_container / handles_bulk, both defaulting true so
  a facility handles everything unless told otherwise; the seeder states the real
  capability.
- The intercity gate now refuses cargo a facility cannot lift, saying which type,
  not just "no facility". canHandleFreight keeps that rule in the resolver so
  callers cannot get it subtly wrong.
- The intercity list resolves each end against the booking's own freight type, so
  the view flags a container booking routed through a bulk-only yard while the
  train is still coming rather than when the load is refused.

Import/export untouched — the gate is still DOMESTIC-only.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-20 07:13:51 +00:00
Marshal
771aa2a605 Add train deactivation feature and import train number management
- Introduced DEACTIVATED status for trains, allowing staff to park trains indefinitely.
- Implemented methods to deactivate and reactivate trains in the TrainBuilderService.
- Added UI components for train deactivation and reactivation in TrainBuilderDetailPage.
- Created a dropdown setting for admin-managed import train numbers, with corresponding migrations.
- Updated yard code length to accommodate soft-delete suffix.
- Enhanced train status handling to include DEACTIVATED state.
2026-07-20 07:04:23 +00:00
marshal
f672d66a92 Merge pull request #826 from Tria-plc/freight_feature/usermanagement
changes
2026-07-20 06:06:06 +03:00
Marshal
4969f62896 changes 2026-07-20 03:05:28 +00:00
marshal
5ac48bf05b Merge pull request #799 from Tria-plc/freight_feature/usermanagement
add per-container handling options for hazardous, reefer, and return…
2026-07-18 22:22:46 +03:00
Marshal
0dead281ce add per-container handling options for hazardous, reefer, and return services
- Introduced new boolean fields (isHazardous, isReefer, isReturn) in UnitDraft and related interfaces to allow individual container handling options.
- Updated emptyUnit function to initialize these new fields.
- Modified GlCreateBookingForm to handle and display these options for each container.
- Adjusted calculations for hazardous, reefer, and return quantities based on the new handling options.
- Updated the schema for container units and booking container lines to include handling options.
- Added migration to support the new return flag in the database.
- Enhanced various components to reflect gross weight calculations, ensuring consistency across the application.
2026-07-18 19:20:45 +00:00
marshal
bc6999cd10 Merge pull request #786 from Tria-plc/freight_feature/usermanagement
split export
2026-07-18 12:20:48 +03:00
Marshal
406fbf6c45 split export 2026-07-18 09:12:52 +00:00
marshal
f8d5030e97 Merge pull request #782 from Tria-plc/freight_feature/usermanagement
add lashing surcharge for cargo types with hasLashing flag
2026-07-18 02:27:50 +03:00
Marshal
3a1a08b1e1 add lashing surcharge for cargo types with hasLashing flag
add lashing surcharge for cargo types with hasLashing flag
2026-07-17 23:25:53 +00:00
Hagernesh
30f48ea37f feat(intercity): show intercity cargo across every train
Intercity bookings never get their own train — they ride whichever import/export
train passes through their corridor — so the work is scattered across other
people's schedules and there was nowhere to see it as a whole. The per-schedule
ride-along panel answers "what can THIS train carry"; this answers "what is
happening to intercity cargo".

Purely additive: the existing ride-along panel and the schedule detail page are
untouched, and loading/unloading still happens there, where the train's position
is confirmed. This is a read-only view that points back to it.

Each row carries both ends' facility status, because a booking whose origin or
destination has no equipment can never be worked there — the operator should see
that while the train is still coming, not when the load is refused. Those
bookings are counted and called out.

New GET /train-scheduling/intercity/bookings; the type is IntercityRideAlongRow,
not IntercityBookingRow, which already means the per-schedule candidate row.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-17 11:27:40 +00:00
Hagernesh
a73faecbe3 feat(intercity): raise a GRN when a facility loads or unloads cargo
Every facility raises a GRN — the goods changed hands, whether or not anyone
stores them. What differs is what happens next: Indode has a warehouse, so cargo
left there goes through the existing warehouse flow and accrues storage and
demurrage; Sebeta, Modjo, Adama and Dire Dawa only move cargo between train and
truck, so the handling event and its GRN are the whole record.

facility_handling_events carries that record because warehouse_inventory cannot:
its warehouse/yard/zone are NOT NULL, so a facility with equipment but no
warehouse could never have a row there. inventory_id links the storage record
when the facility does keep the cargo, which is what ties an Indode handover to
its demurrage.

generateGrnNumber moves to common/grn.util.ts so a GRN raised at a facility is
indistinguishable from one raised in a warehouse — the two live in different
tables, and a second generator would let the formats drift.

Recording is best-effort: the cargo moved regardless, so paperwork must never
fail the journey.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-17 10:40:16 +00:00
Hagernesh
a411e0bdd0 feat(intercity): only load/unload where the yard has a facility
Intercity cargo rides a passing train and is handled at the booking's own yards,
so those yards need the equipment to do it — a train stopping somewhere is not
the same as somewhere being able to load it. Loading at an origin or unloading at
a destination without has_facility is now refused, naming the yard.

The check sits inside loadBooking/unloadBooking rather than the intercity
controller wrapper, because recording a checkpoint auto-unloads every booking
destined at that yard (autoUnloadAtYard) and would otherwise route around it.

Import/export are untouched: their cargo is handled at the route's terminal
ports, not at an arbitrary mid-corridor yard, so the gate returns early for
anything that isn't DOMESTIC.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-17 10:40:16 +00:00
Marshal
801872c106 fix rate edit 2026-07-17 10:15:26 +00:00
Marshal
308df1c61c fix schule issue and contianer type issue 2026-07-17 09:18:26 +00:00
Marshal
7b7e7c3f62 fix schule issue and contianer type issue 2026-07-17 09:16:35 +00:00
Hagernesh
d9db4cbc0c fix(train-scheduling): scope the not-loaded dispatch guard to EXPORT only
The guard fired on every dispatch. Loading out of an origin warehouse is an
export concept — import cargo isn't loaded from a warehouse, so its warehouse
inventory says nothing about what's aboard and the check would have blocked
legitimate import dispatches. Derive the route direction (reusing
deriveTradeDirection, as the warehouse loading queue does) and return early for
anything that isn't EXPORT. Import and domestic behave exactly as before.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-17 08:01:57 +00:00
Hagernesh
2798fed6d8 fix(train-scheduling): block dispatch when allocated cargo is not loaded
dispatchSchedule guarded status, Djibouti departure rules, locomotives and
wagons — but never checked the cargo. A train could be dispatched while the
bookings allocated to it sat received in the warehouse, silently leaving them
behind. Dispatch now refuses when an allocated booking has warehouse inventory
in RECEIVED/STORED/READY_FOR_LOADING, naming the bookings and pointing at the
two ways out: load them, or drop the wagon allocation so they ride a later
train. Bookings with no inventory at all are not blocked — allocating a wagon
before the goods arrive is normal planning.

Also drops RESERVED from the Load-to-Train filters: reserved stock is not
awaiting loading.

The sched_bookings CTE moves to common/schedule-bookings.sql so the warehouse
loading queue and this dispatch guard resolve a train's bookings identically —
if they drift, a train departs leaving cargo the warehouse still expects to load.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-17 08:01:57 +00:00
Nathnael
e626e1db63 Merge branch 'dev' into freight/feat/fixes-v1 2026-07-16 13:23:40 +00:00
Nathnael
f71bbbf782 feat: setup account page for customer and centeralize the otps and phone usages to use the iam user 2026-07-16 12:08:45 +00:00
marshal
35a9d25aaa Merge pull request #734 from Tria-plc/freight_feature/usermanagement
fix u=issue
2026-07-16 15:02:40 +03:00
Marshal
e8e12c1363 fix u=issue 2026-07-16 12:02:11 +00:00
Nathnael
6dde17fa4d fix: premature payable invoice 2026-07-16 08:38:49 +00:00
Marshal
41fe04652f fix issue 2026-07-16 00:33:31 +00:00
Marshal
19c9da28ae changes 2026-07-15 13:29:01 +00:00
Marshal
11771e5f92 remove reopen delay minutes from global rules and update related types
- Removed the  field from  and related components.
- Updated  to reflect the removal of the reopen delay input field.
- Modified  to include new train number fields:  and .
- Added  interface to manage active schedules with trade direction.
- Introduced  interface to track wagon shortages in bookings.
- Updated  logic to ensure consistent UI state representation.
- Created migrations to drop the  column and add  and  columns to the  table.
- Added tests for the new booking window display logic and wagon planning functionality.
2026-07-15 09:13:02 +00:00
Marshal
9be7f356f0 enhance train scheduling logic to exclude cancelled trains and refine window filtering 2026-07-15 07:07:10 +00:00
Marshal
5cffe2860c fix train builder and consolidation 2026-07-14 13:49:39 +00:00
Marshal
b5a97d344a train 2026-07-14 13:10:00 +00:00
Marshal
6d0cf50b4d train 2026-07-14 11:06:49 +00:00
Marshal
957a185a4d enhance contract clearance and train scheduling logic; add filters for clearance documents and improve booking validation 2026-07-13 21:40:10 +00:00
Marshal
3fe4ea72ac update train scheduling logic to clear trainScheduleId when unassigning bookings 2026-07-13 11:47:27 +00:00
Marshal
9e748d6291 improve group window 2026-07-13 11:07:14 +00:00
Marshal
a4ccdb1173 add wagon allocation snapshot to train schedules 2026-07-13 08:56:06 +00:00
Marshal
e7e5b93ffc add customs clearing filter and enhance clearance documents page for non-customs contracts 2026-07-12 14:14:21 +00:00
Marshal
84ba56f7d0 implement batch board notification system for schedule changes and updates 2026-07-12 12:01:05 +00:00
Marshal
4b7f6d2548 enhance contract and booking services with server-side search and validation improvements
- Added  parameter to  and  for server-side free-text search on contract reference, company name, and booking details.
- Introduced new validation errors in  for container clashes and space issues when creating bookings.
- Implemented paginated dropdown settings retrieval in .
- Updated  to fetch active yards using a new method that handles pagination.
- Enhanced  with a  method to fetch all records by walking through pages.
- Refactored  to support filtering and pagination in schedule listings.
- Improved  to return a paginated list of facilities.
- Updated UI components in  and  to utilize debounced search inputs for better performance.
- Added alerts in  to inform users about booking constraints related to splits and capacity.
- Enhanced  to display notifications for split bookings and capacity usage.
2026-07-12 10:51:31 +00:00
Marshal
1121e9ce82 Implement clearance-first booking flow and completion process for customs contracts 2026-07-10 21:51:59 +00:00
Marshal
a58650bdfb update booking logic for train schedules and customs contracts 2026-07-10 12:13:08 +00:00
Marshal
10111c9e01 merge 2026-07-10 11:08:30 +00:00