Files
edr-platform/.portal-flows-assets/08-contract-step1-filled-full.png
Hagernesh 69062389c7 fix(train-scheduling): marshalling docs respect mid-corridor wagon coupling
Origin marshalling (import + export) now prints leg slots as
TO BE LOADED AT <board yard> with board/alight stations and keeps
their containers out of the loaded tallies. Intercity Marshalling 2 no
longer hides whole-route cargo whose allocation never left PLANNED
(import flow confirms loading at schedule level), so the on-board view
matches the physical consist before and after mid-corridor coupling.
2026-08-26 08:30:38 +00:00

234 KiB
1600x1112px

/Tria/edr-platform/raw/commit/69062389c7ff748247974184ae3b78c2a28b09e8/.portal-flows-assets/08-contract-step1-filled-full.png